Firm Assists as Project Counsel
The firm’s client was the prime contractor on a public street rehabilitation project. During project close out, the owner refused to pay...
The firm’s client was the prime contractor on a public street rehabilitation project. During project close out, the owner refused to pay...
The firm recovered $900k for a CA prime contractor in a school district payment dispute via Public Contract Code 9204—100% recovered without litigation.
In a general contractor versus subcontractor dispute, the firm challenged the general contractor's license status contending the Responsible Managing Officer
The firm represented a national non-profit dedicated to assisting black contractors in the construction industry. The firm’s client was sued…
The firm represented the prime contractor in a claim by a school district that the installed window system was defective. …
The firm represented a general contractor in a dispute with a subcontractor on a public works construction project. Disputes arose…
The firm represented a NYSE-listed company in defense of alter ego claims asserted by a subcontractor to a subsidiary entity…
The firm represented a general engineering contractor in presenting and proving differing site condition claims related to a utility vault…
The firm's client was terminated by a City for default for not proceeding with massive dewatering work necessary for a…
The firm represented an ENR Top 10 general engineering contractor on a major highway upgrade project in California. Concrete placed in two…
The firm’s client was the second low bidder on a roughly $49 million dollar public works project. The firm filed a…
Firm Settles Multi-Million Dollar Claim for Fraction of Amount Demanded