Seven-Figure Recovery for Differing Site Condition on Cofferdam Floodwall Project
The firm represented a general contractor in pursuing claims against a local flood control agency for costs incurred due to…
The firm represented a general contractor in pursuing claims against a local flood control agency for costs incurred due to…
The firm represented a specialty subcontractor pursuing a general contractor for delay and disruption costs on a billion-dollar design-build highway…
Our firm represented a coastal landowner whose bluff property was damaged after a neighbor’s contractor blocked a key drainage system,…
The firm represented the prime contractor and one of its subcontractors against a Port District on a claim for extra…
The firm represented the general contractor on an airport improvement project. A surveyor was overheard referring to a project engineer…
The firm represented a design-build contractor in arbitration related to cost overruns and delays caused by the state’s failure to…
The firm represented a bridge-building subcontractor in litigation involving a CIDH pile contractor and the general contractor. The dispute centered…
The firm represented an engineering contractor in a lawsuit to recover delay and disruption costs for building a replacement bridge. …
The Firm's client was the engineering contractor for construction of over $250 million in upgrades to a water treatment plant. The engineering contractor…
The firm represented a general contractor on two publicly funded construction projects related to the client's bonded structural steel subcontractor…
Cell-Crete Corporation v. Fed. Ins. Co. (2022) 82 Cal. App.5th 1090. Payment bond surety sought fees and costs following summary…
The firm represented the general contractor concerning the default termination of a framing subcontractor on a remote USACE project. The…