General Contractor Terminates Surveyor For Racial Bigotry
The firm represented the general contractor on an airport improvement project. A surveyor was overheard referring to a project engineer…
The firm represented the general contractor on an airport improvement project. A surveyor was overheard referring to a project engineer…
The firm represented a design-build contractor in arbitration related to cost overruns and delays caused by the state’s failure to…
The firm represented a bridge-building subcontractor in litigation involving a CIDH pile contractor and the general contractor. The dispute centered…
The firm represented an engineering contractor in a lawsuit to recover delay and disruption costs for building a replacement bridge. …
The Firm's client was the engineering contractor for construction of over $250 million in upgrades to a water treatment plant. The engineering contractor…
The Firm's client was the prime contractor to construct significant upgrades to a water treatment plant. Prime contractor subcontracted…
Cell-Crete Corporation v. Fed. Ins. Co. (2022) 82 Cal. App.5th 1090. Payment bond surety sought fees and costs following summary…
The firm played central role in representing the lead developer and operator in negotiation of a $204 Million Design-Build-Operate Maintain…
Client design-builder had an approximately $14 million dispute with its concrete subcontractor related to construction of a large airport rental…
The firm represented the prime contractor constructing a water reclamation and treatment project for a large water district. The project…
RAIL PROJECT The firm represented the general contractor in defense of an underground utility subcontractor's multi-million dollar dispute concerning project…
The firm represented a general contractor bridge builder against a specialty design-build subcontractor in a lawsuit. Both parties alleged material…